Butler High School Construction, June 15, 2011
June 20th, 2011Dining al fresco
May 19th, 2010The crews continue to make speedy progress on the demolition of the high school. On May 18, the cafeteria and kitchen were exposed to the elements when the roof and most of the walls were removed. The first image looks through into the media center, where debris has been piled to be sorted and discarded once demolition starts in that area. The second image shows the south wall of the cafeteria. The third image shows what remains of the kitchen. The boiler room beneath the cafeteria can also be seen in this photo.