Windows at Morton, casework at Butler
Big changes are occurring at the Morton site! Windows are being installed on the academic wing, and brick and stone work are rapidly changing the face of the building. Work continues on the infrastructure. Construction crews are pushing to get the building under roof and dried in so interior work can begin.
At Butler, some classrooms are beginning to come together with floor tile, casework, and lighting fixtures. HVAC infrastructure is being installed in the PAT. Curtain wall windows will begin arriving soon, and site work along the Dixie Drive side of the building will continue as weather allows.
Check out some of the recent photos here.